User interface platform
Smart Building Overlay to the RIBA Plan of Work, published by the RIBA in 2024, states:
User interface platforms refer to any software solution through which the user engages with the building and its data, this includes but is no limited to:
- Smart building platform, building operational platform, integrated building management system, performance twin – commonly used terminology for a single platform which integrates multiple building sub-systems and supporting technologies.
- User app: mobile application enabling all building user to engage, control & feedback on building operation.
- Digital twin: introduced previously form part of user interface platforms.
[edit] Related articles on Designing Buildings
Featured articles and news
Our next guest editor Christine Peever
Practising Architect and Director of Sheldon Peever Studio.
Biodiversity net gain, tips and tools for small sites
How to deal with BNG when options become limited.
Registered building inspectors
Building types and conflicts of interest updates explained.
A brief run-down reminder of key points to note.
New electrical apprentice rates
Fair pay for much needed pipeline of electrical apprentices.
BSRIA's commitment to sustainability and net zero
Key documents that represent an early shift in thinking.
A resource for Cleaner Air, Better Tomorrow.
Awe-inspiring medieval great barns.
A history of timber construction in the UK
From a timber Stonehenge to half timber houses.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.